Thursday Jun 22, 2017
6:00 PM - 7:30 PM EDT
June 22, 2017
6:00 – 7:30 PM
Fred Lippmann Multi-Purpose Center
2030 Polk Street
Hollywood, FL 33020.
Ivan Cabrera 954-924-2980
Send Email
The Hollywood CRA and Toole Design Group will be conducting a Roadway Feasibility Study for Young Circle. This study will examine the feasibility of improving the public realm experience and functioning of Young Circle in Downtown Hollywood.
The goal of this project is to analyze the block structure and collaboratively develop and assess the feasibility of new street cross-sections and a new block structure.
We will hosting the following public meetings at Fred Lippmann Multi-Purpose Center, 2030 Polk Street, Hollywood, FL 33020.
May 15, 2017 6:00 – 7:30 PM
May 18, 2017 6:00 – 7:30 PM
June 22, 2017 6:00 – 7:30 PM